2026-11-3 HOA Board Meeting

2026-11-3 HOA Board Meeting
7pm; Joel Steven’s home
Present: Mackenzie, Catie, Joel, Kimberlee

Agenda & Discussion:

  1. Treasurer’s Report
    Annual Dues Update:
    ● We received dues from 95% of lots (100)
    ● We collected 83% ($3,744) of the outstanding dues that we started the year with.
    ● Current outstanding amount: $1,728
    ○ 4 lots x 2026 dues ($120)
    ○ 2 lots x 2026 + 1 year past due ($216)
    ○ 1 lot x 2026 + 2 years past due ($312)
    ○ 1 lot x 2026 + 4 years past due ($504)
    New Payment Method:
    ● I signed up for Zelle, linked to our checking account, with a unique tag for WSE. This will be
    offered as an option for annual dues payments with no added transaction fees. I’ve also used it for reimbursements.
    Account Summary
    ● Our account balance is $10,002.41, including $ 5,000 in reserve funds and $ 5,002.41 in
    unrestricted funds.
    ● Anticipate $2,150 in expenses before year-end for insurance and landscaping, leaving about
    $2,800 available for other expenses in addition to our reserve.
    Account Summary:
    STARTING BALANCE 1/1/26 $ 5,879.67
    INCOME $ 17,188.00
    EXPENSE $ (13,065.26)
    ACCOUNT BALANCE $ 10,002.41
    RESERVE FUNDS (TREE & LEGAL) $ (5,000.00)
    UNRESTRICTED FUNDS BALANCE $ 5,002.41
  2. Stairs Project Update
    Earlier this year, we formed a stair project committee consisting of two board members and four community members. We discussed and researched multiple options for the rebuilding. Because of our budget limits and our volunteers’ skill set, we decided to rebuild the stairs as wood-framed, but we made some design adjustments to make them more resistant to rot.
    We have completed most of the stair-rebuilding project for the pathway between Upper and Lower Ventura Court. Over 4 workdays, community volunteers worked hard to demolish, build stair frames, drive rebar, and move gravel.
    We celebrated the project with a picnic in our park and we provided Kona Ice treats to all who attended. We invited the whole HOA, regardless of whether they volunteered on the stairs. It was a great opportunity to get to know neighbors and build community.
    A huge thank you to our community members Mary Pegan, Todd Reitmeier, Noah Reitmeier, and Craig Aznoe for serving on the committee, and to everyone who volunteered and worked so hard on the stairs.
    Rebuild Details
    The lower stairs (13) were built with pressure-treated 4x6s. We built the upper stair frames with two stacked 4x4s. We treated all cut ends with copper-based chemicals for ground contact. The stair frames were assembled with 8” bolts. We drove two rebar posts through the front of each stair frame, and we treated the holes with the copper-based chemical. Stair frames were filled with gravel.
    We reused most of the previous rebar and only needed to buy a minimal amount of new rebar sections. We purchased wood from Parr Lumber: (16) 8’ 4x6s and (75) 8’ 4x4s. We used all the 4x6s and have 16 4x4s remaining, which we will use for the handrail.
    We ordered new signs for the top and bottom of the stairs. The new signs specify that the path is private property and that the HOA assumes no liability for the recreational use of the path. This aligns with Oregon SB 179, which protects private landowners from personal injury liability when they allow the public to use their land for free recreation.
    Expenses
    Materials $ 2,632.20
    Disposal $ 249.28
    Food $ 415.80
    Other $ 360.00
    Project Total $ 3,657.28
  3. Handrail for new Walkway
    Utility Locate identified power lines in the area where we plan to install posts. There is also a “private” drain line (or lines) in the area. Need to follow up with a private locator and maybe a dye check. Joel will follow up.
  4. Tree Root damage to neighbor’s property on SW Alfred St
    The neighbor reached out to the Board with concerns about damage to property due to tree roots from HOA property. The Board will get a recommendation & quote from Mike’s Tree Service to avoid further root damage to the neighbor’s property. Cost will come from our HOA Tree Fund.
  5. Annual HOA Members Meeting scheduled for Wednesday, January 20th at 7pm via Zoom
  6. The Board is still in need of new members! Please reach out and let us know you are interested

STAIRS ARE DONE (almost)!

The stairs have been entirely rebuilt and we think they look awesome. Please be cautious using them, especially the upper section, over the next couple of weeks. We do expect the gravel to settle and compact and we have plans to fill in with a smaller gravel size once it has compacted. In the meantime, the wood frame will sit higher than the gravel center, so watch your step. We will also be installing a handrail in at least the steep area of the upper stairs and are looking into options.

These stairs were brought to you by your awesome neighbors who gave time, sweat, but thankfully, no tears. Thank you to everyone who gave so much time and effort, and to every family member who gave up time to let them volunteer. We had fun celebrating the finish with some Kona Ice, and we hope everyone enjoys using the new stairs.

Volunteers, Picnic + Kona Ice!

We’ll be working again this weekend, starting at 9am each morning, and hoping that Sunday isn’t a full day. Some volunteers can work on the upper stairs while others bring gravel from the lower court and spread it on the path walkway. The stair building will all be based on the upper section of Ventura Ct.

BONUS: Volunteer through lunch and get a smoked brisket sandwich! The brisket is already being prepped!

We also need sledgehammers to drive rebar. Please bring one if you have it. Not volunteering but have one we can use? Drop it off at 9620 SW Ventura Ct.

  • Come for an hour or stay the day.
  • Bring your water, closed toe shoes, work gloves and any additional tools you have from the list in the sign up.
  • Adults and teens welcome! This tighter construction area is not safe for kids or pets, but take the opportunity to hang out in Cougar Woods Park with your neighbors!

Please join us to celebrate with a picnic in the park. You bring your picnic and we’re bringing the desserts. Kona Ice will be serving from 5:00pm – 5:30pm only, so be sure not to miss out. We want to hang out with all the neighbors, so please come by, even if you were not able to help out with the stairs.

Stepping Up Day Two

** The stairs are closed this week. Please DO NOT attempt to use them**

Thanks to everyone who came out for a little or a lot of time. We finished the lower portion of the stairs and made good progress on the upper portion. We still could use help next weekend. We will be staging on the top side next weekend. We’ll see you at the top of the stairs or at 9620.

Stepping Up Day One

Thank you to everyone who came out and worked so hard today on the stairs! We made huge progress on the demo, and the lower portion now has some new steps. Come by tomorrow to volunteer if you have some time. We plan to start around 9am on Sunday and go through lunch until it gets too warm in the afternoon, probably around 3 p.m. We’ll have the smoker going for a lunch break if you are around to help!

Stair Project- Save the Date!!

We finally have plans in the works for fixing up the stairs this fall, but we are going to need your help! Please save the dates below and come help out for a day or more.

We will have exact needs and information closer to the dates as well as requests for tools and equipment but please mark your calendar and plan on helping out if you can.

(If anyone has a beam saw that we could use, or is willing to make some cuts for the project, please let us know.)